Primary Source
FREN
Lesson 3 of 3 · Module 2

How an on-site inspection actually runs

No circular describes the procedure. What the CSSF publishes about its own inspections, the fact validation meeting that decides what the letter says, and the bill at the end.

3:07 Module 2. The injunction, the fine and the inspection CSSF Readiness: requests, inspections and observation letters
The video and the full transcript of this lesson are part of the course This page is the description of the lesson: what it is about, how long it runs and every instrument it is built from. Watching it and reading it word for word need an account with access to CSSF Readiness: requests, inspections and observation letters. Two lessons of this course are open to everyone with no account and no payment.
List price 149 euros
Enrol on this course
Two lessons freeNo account, no payment: lessons 1.1 and 1.2 of this course
The course18 lessons across 6 modules, each with its transcript and its sources
Access12 months from the date of purchase
SourcesOfficial legal texts linked in each lesson
  • The video of every lesson, and the word-for-word transcript beside it
  • Every claim linked to its primary source, with a source register per lesson
  • An assessment for each of the 6 modules, and an end-of-course assessment
  • A printable certificate carrying your name, the date and the content version
  • The downloadable artefacts and one page references for this course

Expensing it? The invoice can be made out to your firm, with its VAT number and your purchase order reference. Buying for several people: seats for a team.

The narrated video runs about 45 minutes across the 18 lessons. That is short on purpose: no filler and no reading out of the law, with the work in the transcripts, the sources, the assessments and the artefacts.

What Module 2 covers

Module 2. The injunction, the fine and the inspection

The injunction and the deadline that is in your letter rather than in a statute, the coercive fine alongside the much larger risk of not answering at all, and how an on-site inspection runs from the annual plan through the fact validation meeting to the observation letter. Lesson 2.1, the injunction, and the clock it starts. Lesson 2.2, the coercive fine, and what it costs to ignore one. Lesson 2.3, how an on-site inspection actually runs.

Sources for this lesson

Every instrument this lesson is built from, linked to its official text

The sequence of an on-site inspection is described by the CSSF in its own annual report under the instruments of supervision. There is no circular. The lump sums charged to an inspected entity are in the Grand-ducal Regulation of 23 December 2022 on the fees to be levied by the CSSF.

The rest of Module 2

Module 2. The injunction, the fine and the inspection

Open this lesson

Access to CSSF Readiness: requests, inspections and observation letters opens the video, the word-for-word transcript, the module assessments and the certificates. If you already have access, sign in and this page becomes the lesson.

Or watch lesson 1-1 of this course free, with no account: CSSF Readiness: requests, inspections and observation letters, the free sample.

149 euros12 months of course access
Buy